Rail Automation Product Manuals

Product Category
Product Title
Type
Document Number
Rev
Manual
Communication
AServer - ATCS Server Data Management Software
User Guide
COM-00-02-10
A.1
Communication
Base Communications Package II (BCP II)
Instruction Installation
COM-00-97-20
C.1
Communication
Base Control Module II (BCM II)
Instruction Installation
COM-00-01-02
C.1
Communication
DC-to-DC Converter A53106
Installation Maintenance
COM-00-04-20
C.2
Communication
ESSR Antenna Kit
Instruction Installation
COM-00-06-02
D.3
Communication
Ethernet Spread Spectrum Radio (ATC) A53325-02, -03
Instruction Installation
COM-00-03-15
A.2
Communication
Ethernet Spread Spectrum Radio A53325-01, -04
Instruction Installation
COM-00-05-05
C.1
Communication
Ethernet Spread Spectrum Radio A53325-05, -06
Instruction Installation
COM-00-08-12
A.1
Communication
Ethernet Spread Spectrum Radio A53350 900MHz
Instruction Installation
COM-00-10-01
A.1
Communication
Ethernet Spread Spectrum Radio A53350 900MHz and A53355 2.4 GHz
Instruction Installation
COM-00-10-15
A.1
Communication
Ethernet Spread Spectrum Radio A53350 900MHz and A53355 2.4 GHz Cluster Hub
Instruction Installation
COM-00-11-01
A.1
Communication
HD/Link™ Vital I/O Module
Application Guidelines
SIG-00-97-05
B.2
Communication
HD/Link™ Vital I/O Module
Trouble-shooting
SIG-00-97-18
B.2
Communication
HD/LINKer Office Application
User Guide
SIG-00-97-08
C.1
Communication
R/Link ATCS Radio Code Line System Installation
Installation Maintenance
COM-00-94-03
A.1
Communication
VHF Communicator
User Guide
SIG-00-03-05-002
D.1
Communication
Wayside Access Gateway (WAG)
Installation Maintenance
COM-00-05-16
C.1
Communication
Wayside Communications Package (WCP)
Instruction Installation
COM-00-98-01
E.3
Communication
WCP CPU II Wayside Communications Module II
Instruction Installation
COM-00-97-10
E.1
Communication
A53689 Airlink Venus Software Defined Radio
Installation & Operation
COM-00-21-04
A.1
Communication
A53687 Airlink Mercury Software Defined Radio
Installation & Operation
COM-00-21-03
A
Communication
A53685 Airlink Mars Software Defined Radio
Installation & Operation
COM-00-21-05
A
Communication

WCC Maintenance Utility
User Manual
COM-00-05-03
C
Communication
Office Communications Gateway (OCG)
User Guide
COM-00-05-04
B.2
Communication
A53680 Airlink WCP
Installation & Operation
COM-00-21-01
B.1
Communication
A53682 Airlink BCP
Installation & Operation
COM-00-21-02
B.1
Product Category
Product Title
Type
Document Number
Rev
Manual
Crossings
Argus Application summary 9V937-A01C
Configuration Summary
SIG-00-07-01-001
C.1
Crossings
Argus Application summary 9V966-A01A
Configuration Summary
SIG-00-08-20-001
A.1
Crossings
Argus Event Recorder
Installation Operation
SIG-00-06-05
F.2
Crossings
Crossing Gate Model S-20
Instruction Maintenance
073019
B
Crossings
Crossing Gate Model S-40
Instruction Maintenance
074044
E.2
Crossings
Crossing Gate Model S-40 Exit
Instruction Maintenance
074044-3
B
Crossings
Electronic Bell
User Guide

SIG-00-04-09

A.2
Crossings
Exit Gate Management System (EGMS)
User Guide
SIG-00-08-16
B.3
Crossings
GCP 3000
Application Guidelines
S-00-93-01
D.2
Crossings
GCP 3000
Instruction Installation
SIG-00-00-02
D.2
Crossings
GCP 3000
Maintainers Handbook
SIG-00-99-01
C.2
Crossings
GCP 3000+
Instruction Installation
SIG-00-17-03
A.4
Crossings
GCP 3000+

Application Guidelines

SIG-00-17-04
A.2
Crossings
GCP 3000+
Field Manual
SIG-00-18-01
A.4
Crossings
GCP 4000 (MCF’s gcp-t6x-02-0 and later)
Application Guidelines
SIG-00-08-06D
D
Crossings
GCP 4000 Legacy
Field Manual
SIG-00-08-10
D.2
Crossings
GCP 5000
Field Manual
SIG-00-13-03
A.8
Crossings
GCP 5000 GRADE CROSSING PREDICTOR FOR ELECTRIFIED TERRITORY (GCE)
Instruction Installation
SIG-00-22-02
B.1
Crossings
Ground Fault Tester
User Guide
SIG-00-03-05-003
B.3
Crossings
Ground Fault Tester 2 (GFT 2)
User Guide
SIG-00-15-06
A
Crossings
iLOD (A80271)
User Guide
SIG-00-03-05-005
B.1
Crossings
Inductive Loop Vehicle Detector Model E-1400S
Instruction Installation
SIG-00-09-02
A.1
Crossings
Inductive Loop Vehicle Detector Model P-1400S
Instruction Installation
SIG-00-09-19
A.1
Crossings
Inductive Loop Vehicle Detector Model U-1400S
Instruction Installation
SIG-00-09-05
A.1
Crossings
IPI_Intelligent Processor Island (IPI) and IPI Track Circuit (IPITC)
Instruction Installation
SIG-00-97-04
D.3
Crossings
Motion Sensor 2000
Instruction Installation
SIG-00-97-01
B.1
Crossings
Motion Sensor 4000
Instruction Installation
SIG-00-11-02
A.8
Crossings
SEAR II Application Summary 9V505-A01A
Configuration Summary
SIG-00-09-07-001
A.2
Crossings
SEAR II Application Summary 9V736-A01D
Configuration Summary
SIG-00-04-18-001
D.1
Crossings
SEAR II Application Summary 9V736-A02B
Configuration Summary
SIG-00-13-01-001
B
Crossings
SEAR II Application Summary 9V737-A01E
Configuration Summary
SIG-00-04-14-001
E.1
Crossings
SEAR IIi Application Summary 9V814-A01C

Configuration Summary

SIG-00-04-04-001
C.1
Crossings
SEAR II Application Summary 9V835-A01B

Configuration Summary

SIG-00-04-15-001
B.1
Crossings
SEAR IIi Application Summary 9V864-A01P

Configuration Summary

SIG-00-05-02-001
P.1
Crossings
SEAR II Application Summary 9V871-A01F

Configuration Summary

SIG-00-05-11-001
F.1
Crossings
SEAR II Application Summary 9V899-A01D

Configuration Summary

SIG-00-06-03-001
D.1
Crossings

SEAR II Application Summary 9V908-A01A

Configuration Summary

SIG-00-06-04-001
A.1
Crossings
SEAR IIi Application Summary 9V958-A01B

Configuration Summary

SIG-00-08-08-001
B.1
Crossings
SEAR II Application Summary 9VC28-A01A

Configuration Summary

SIG-00-13-10-001
A.1
Crossings
SEAR IIi Internal Event Recorder
Field Manual
SIG-00-08-13
A.2
Crossings
SEAR IIi for GCP 5000
Field Manual
SIG-00-19-03 
A.1
Crossings
Event Analyzer Recorder (SEAR II) A80273
Installation
Operation
SIG-00-02-07
B.7
Crossings
SSCC III Plus

Instruction Installation

SIG-00-02-03
F.1
Crossings
SSCC IIIA

Instruction Installation

SIG-00-02-12
E.1
Crossings
SSCC IV

Instruction Installation

SIG-00-03-02
F.1
Crossings
Crossing Gate Model S-60
Instruction Maintenance
074050
G
Crossings
Wayside Inspector
Application Guidelines
SIG-00-16-05
A.1
Crossings
Wayside Inspector
Instruction Installation
SIG-00-16-03
 A.1
Crossings
Wayside Inspector
Cloud Application User Manual
SIG-00-20-02
A
Crossings
NS Backhaul for Argus and SEARII/IIi
Service Manual
SIG-00-20-06
A
Crossings
GCP 4000
Field Manual
SIG-00-12-68
A.8
Crossings
GCP 5000
Field Manual
SIG-00-13-03
A.9
Crossings
GCP 4000 Legacy
Field Manual
SIG-00-08-10
D.3
Crossings
CPU III for GCP
User Guide
SIG-00-15-05
A.4
Crossings
Office Configuration Editor (OCE)
User Guide
SIG-00-11-15
B.3
Crossings
GCP 5000
Application Guidelines
SIG-00-13-04
A.3
Crossings
SEAR IIi Application Summary 9VC29-A01A
Configuration Summary
SIG-00-13-11-001
B
Crossings
SEAR II Application Summary 9VE50-A01A
Configuration Summary
SIG-00-22-08
A
Product Category
Product Title
Type
Document Number
Rev
Manual
Electromechanical
Battery Chargers SJ Series
Instruction Installation
SIG-00-00-18
B.1
Electromechanical
DC-AC Inverter
User Guide
SIG-00-07-07
A.1
Electromechanical
Dwarf Colorlight Signal
Instruction Maintenance
CLS-10
D
Electromechanical
Hybrid Lighting Arrester
Data Sheet
SIG-00-04-25
B.1
Electromechanical
Power Line Surge Protector SP-36
Instruction Maintenance
SIG-00-00-10
A.1
Electromechanical
Power Line Surge Protector SP-37
Instruction Maintenance
SIG-00-00-09
A.1
Electromechanical
Surge Protection Network SP17 SP18 SP19 SP-1A-1B
Instruction Maintenance
SIG-00-00-03
A.1
Electromechanical
Surge Protection Network SP17 SP18 SP19 SP-2A-2B
Instruction Maintenance
SIG-00-00-04
A.1
Electromechanical
Surge Protection Network SP20 -2 -2A -3 -3A -4 -4A
Instruction Maintenance
SIG-00-00-05
B.1
Electromechanical
Surge Protection Network SP21 -1 -2 -3 -4
Instruction Maintenance
SIG-00-00-06
A.1
Electromechanical
Surge Protection Network SP24-1A – 1B – 2A – 2B
Instruction Maintenance
SIG-00-00-08
A.1
Electromechanical
Surge Protection Network SP26-2 SP26-2-50 SP26-6
Instruction Maintenance
SIG-00-00-07
A.1
Electromechanical
Surge Suppression Panels
Instruction Maintenance
SIG-00-99-09
A.1
Product Category
Product Title
Type
Document Number
Rev
Manual
Onboard
Alerter System (Q-2517-XX)
Instruction Installation
OBE-00-15-03
C.3
Onboard
Dynamic Brake Monitor (DBM)
User Guide
OBE-00-10-13
A.1
Onboard
Head of Train Device (Q3452/R2 & V3452/R2)
Instruction Installation
OBE-00-12-01
B
Onboard
Head of Train Device (HOT or HTD) Q3467/V3467
User Guide
OBE-00-09-15
B.2
Onboard
Head of Train Device, Console Unit
Instruction Installation
OBE-00-12-05
F
Onboard
HOT/EOT Repeaters, Q3440/R & Q3443
User Guide
OBE-00-17-01
A
Onboard
Locomotive Fuel Optimizer (LFO)
User Guide
OBE-00-10-03
A.1
Onboard
Speed Indicator With Adjustable Over-speed
User Guide
OBE-00-09-17
A.1
Onboard
Train Sentinel
Application Guidelines
OBE-00-11-03
A.1
Onboard
Train Sentinel System

Instruction Installation

OBE-00-11-04
A.1
Onboard
Trainguard EOT, A90385
Instruction & Operation Manual
OBE-00-17-06
A
Onboard
Q3920 3G to 4G Retrofit Guide
User Guide
OBE-00-22-01
A.1
Onboard
END-OF-TRAIN DEVICE, MODELS Q3920 & R3930 (DUAL PIPE) & Q3922-14 (ZERO-LEAK)
Instruction & Service Manual
OBE-00-11-14

D.4

 

 

 

Product Category

Product Title
Type
Document Number
Rev
Manual
Wayside
Communications Manager
Instruction Installation
COM-00-08-13
A.5
Wayside
CPU III for GEO and WayConneX
User Guide
SIG-00-15-04
A
Wayside
Echelon Configuration Handbook
Instruction Installation
COM-00-07-09
A.1
Wayside
GEO Diagnostic Terminal (DT) Handbook – Appliance Model
Handbook
SIG-00-04-17
C.1
Wayside
GEO Field Reference Manual
User Guide
SIG-00-05-09
D
Wayside
GEO GDT (PC Laptop Version)
Handbook
SIG-00-01-14
C.1
Wayside
GEO Maintainer’s Handbook
Handbook
SIG-00-04-01
D
Wayside
GEO MCF Manager
User Guide
SIG-00-03-03
A.1
Wayside
Geographic Configuration Suite (GCS)
Application Guidelines
SIG-00-05-13
B.1
Wayside
Interlogic (Ladder Logic) Program Instruction
Instruction Installation
SIG-00-13-06
A
Wayside
Local IO Panel
Instruction Installation
COM-00-07-02
A.2
Wayside
Phase Shift Overlay (PSO III)
Instruction Installation
SIG-00-00-19
A
Wayside
Phase Shift Overlay Plus (PSO+)
Instruction Installation
SIG-00-10-16
B.1
Wayside
Phase Shift Overlay (PSO4000)
Instruction Installation
SIG-00-07-06
C.6
Wayside
Scalable Digital Input Module

User Guide

SIG-00-03-05-004
A.1
Wayside
SE-3 100 Hz Track Circuit
Instruction Maintenance
SIG-00-00-13
C.2
Wayside
SE-3 60 Hz Track Circuit
Instruction Maintenance
SIG-00-03-04
C.2
Wayside
SE-3 83.3 Hz Track Circuit
Instruction Maintenance
SIG-00-10-19
C.2
Wayside
SE-3 91.7 Hz Track Circuit
Instruction Maintenance
SIG-00-05-15
C.2
Wayside
Vital Interface Unit (VIU-20e) (ACSES)
Instruction Installation

SIG-00-09-06

E.5
Wayside
Vital Interface Unit / Coded Audio Track (VIU/CAT)
Instruction Installation
SIG-00-08-19
B.1
Wayside
Vital Interface Unit 20 Inputs / Outputs (VIU-20)
Instruction Installation
SIG-00-07-11
B.2
Wayside
Vital Timer Relay Assembly
Instruction Installation
SIG-00-08-02
A.1
Wayside
VIU-16i and VIU-8i
Instruction Installation
SIG-00-09-11
C.2
Wayside
WayConneX Configuration Tool (WCCT)
User Guide
SIG-00-14-01
C.1
Wayside
WIU Current Sensor
User Guide
SIG-00-11-10
A.1
Wayside
PTC Console
Instruction Installation
SIG-00-13-12
B
Wayside
iVIU Console
Instruction Installation
SIG-00-11-05
B
Wayside
Distance to Couple (DTC) System
Instruction and Installation
SIG-00-21-02
A.1
Product Title
Document Number
Rev
Manual
DT Installation Procedure A for GCP 4000 Display Using a Compact Flash Device (A80485-1)
SIG-QG-09-02
B.1
DT Installation Procedure B for GCP 4000 Display II Using a USB Device (A80407-1 & Early A80407-3)
SIG-QG-09-03
B.1
ESSR-WAG-HD/Link
SIG-QG-08-02
A.1
GCP Display Module Configuration and Operation (A80485-1)
SIG-QG-17-05
A.2
GCP 5000 OOS Override Feature 
SIG-QG-20-03
A
GEO Configuration and File Operations (Part 1)
SIG-QG-08-04-002-1
A.1
GEO Configuration and File Operations (Part 2)
SIG-QG-08-04-002-2
A.1
Install MS4000
SIG-QG-11-01
A.2
Install PSO 4000 Crossing Assembly Modules
SIG-QG-10-06
A.1
Install PSO 4000 Transceiver as Electric Lock
SIG-QG-10-05
A.1
Install PSO 4000 Transceiver module as Repeater
SIG-QG-10-04
A.1
Install PSO 4000 Transmitter/Receiver Modules
SIG-QG-10-03
A.1
Install PSO+ Transmitter/Receiver Modules
SIG-QG-10-07
B.1
Installing Lattice ispVM USB Driver SW on a computer
SIG-QG-09-04
B.1
Installing Master (MEF) and Slave (SEF) Executive Files SSCC IIIA, III+ and IV
SIG-QG-08-22-001
B
Installing MCF Files in SSCC IIIA, III+ and IV
SIG-QG-08-23-001
A.1
Installing the Ritron Radio in WCP Assembly
SIG-QG-18-01
B
Installing Xilinx SW on the WAG
SIG-QG-09-06
A.1
Replace PSO II or PSO III Modules with PSO 4000 Module
SIG-00-10-02
A.1
Replacing CPU II+ MEFs In The 4000 GCP
SIG-QG-07-01
B.1
Replacing MCFs in the GCP 4000
SIG-QG-10-01
A.1
Replacing Track Card MEF’s In The 4000 GCP

SIG-QG-08-03

C.1
S-60 Crossing Auxiliary Overload Device
SIG-QG-09-01
A.1
Saving Files To The USB Drive Using The USB Wizard
SIG-QG-07-02-001
A.1
SEAR II Configuration and HyperTerminal Setup
SIG-QG-08-04-001
A.1
Software Installation (9V121-A01M)
SIG-QG-09-07
A.1
Software Upgrade Quick Start Guide for 3000 GCP (9V121-A01L)
SIG-QG-08-05
A.1
Upgrading Firmware (CPLD) in the GCP 4000 Track Module (80418)
SIG-QG-09-05
B.1
VHF Communicator Voice Library Quick Start Guide 80276 (9V849)
SIG-QG-00-08-01
A.1
WAG Configuration
SIG-QG-08-04-003
A.1
Wheel Detector (WSD-E) Quick Start Guide

SIG-QG-16-01

A
 GCP Web User Interface
SIG-QG-20-02
A.2
S-80 Gate Mech Quick Start Guide
SIG-QG-21-01
B
Product Title
Document Number
Software
Rev
Manual
Data Recorder Module 80115 (For Model 3000 GCP)
SIG-00-01-17
9V309-01E
C
Intelligent  Processor Island Module (IPI)
SIG-00-00-11
80211/62609
B.1
Processor Module 80214  (For Model 3000 GCP)
SIG-00-02-09
9V121-02J
A
Processor Module 80214 (For Model 3000 GCP)
SIG-00-00-21
9V121-01E
A
Processor Module 80224 (For Model 2000 Motion Sensor)
SIG-00-00-25
9V126-01F
A.1